Land associated with Rawhead Farm is a 1.5 MW onshore wind project in Scotland. The applicant or operator on record is Raahead WT Limited. The application has been withdrawn or the scheme abandoned. The determining authority is South Lanarkshire, reference EK/14/0319.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningOct 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2016-05-27.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.500 MW
Registered Capacity

πŸ“‹ Project Overview

Land associated with Rawhead Farm is a 1.5 MW onshore wind project in Scotland. The applicant or operator on record is Raahead WT Limited. The application has been withdrawn or the scheme abandoned. The determining authority is South Lanarkshire, reference EK/14/0319.

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRaahead WT Limited
Owner / operatorRaahead WT Limited
LocationMuirhall Farm, Carnwath, Lanark, Strathclyde, Lanarkshire, ML11 8LL
RegionScotland
Coordinates55.7065289Β°N, 4.206057Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)1.5
No. of Turbines1
Height of Turbines (m)120

πŸ“… Project Timeline

2014-10-31