Land adjacent to Culham Science Centre is a 7 MW solar farm project in South East. The applicant or operator on record is Culham Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is South Oxfordshire, reference P14/S3192/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningNov 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedNov 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2017-01-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

7.000 MW
Registered Capacity

πŸ“‹ Project Overview

Land adjacent to Culham Science Centre is a 7 MW solar farm project in South East. The applicant or operator on record is Culham Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is South Oxfordshire, reference P14/S3192/FUL.

Site Schematic

SUBSTATION ? ha Β· 7 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)7.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperCulham Renewables
Owner / operatorCulham Renewables
Year consented2015
LocationFullamoor Farm House, Clifton Hampden, Abingdon, Oxfordshire, OX14 3DD
RegionSouth East
Coordinates51.6521314Β°N, 1.2301237Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)73000

πŸ“… Project Timeline

2014-11-11
2015-11-18