Solar Farm

Land adjacent to A422

Land adjacent to A422, Buckingham road near Brackley, Buckinghamshire, NN13 5JB

Land adjacent to A422 is a 1.6 MW solar farm project in South East. The applicant or operator on record is Lark Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Buckinghamshire, reference 14/03309/APP.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningNov 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2015-02-09.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.600 MW
Registered Capacity

πŸ“‹ Project Overview

Land adjacent to A422 is a 1.6 MW solar farm project in South East. The applicant or operator on record is Lark Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Buckinghamshire, reference 14/03309/APP.

Site Schematic

SUBSTATION ? ha Β· 1.6 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperLark Energy
Owner / operatorLark Energy
LocationLand adjacent to A422, Buckingham road near Brackley, Buckinghamshire, NN13 5JB
RegionSouth East
Coordinates52.019811Β°N, 1.1251858Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)75000

πŸ“… Project Timeline

2014-11-12