πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Battery Storage

Land adjacent Bonnybridge Substation

Land To The North Of Scottish Power Falkirk Road Bonnybridge, Falkirk, FK4 1BA

Land adjacent Bonnybridge Substation is a 19.9 MW battery storage project in Scotland. The applicant or operator on record is Reliable Generation. The application has been withdrawn or the scheme abandoned. The determining authority is Falkirk, reference P/17/0109/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningMar 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2019-07-18.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

19.900 MW
Power Capacity

πŸ“‹ Project Overview

Land adjacent Bonnybridge Substation is a 19.9 MW battery storage project in Scotland. The applicant or operator on record is Reliable Generation. The application has been withdrawn or the scheme abandoned. The determining authority is Falkirk, reference P/17/0109/FUL.

Site Schematic

GRID CONNECTION TRANSFORMER 33 kV DC BUSBAR 1234567891011121314151617181920 ? Γ— Battery Units

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)19.900 MW
Battery chemistryStand-alone Storage

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperReliable Generation
Owner / operatorReliable Generation
LocationLand To The North Of Scottish Power Falkirk Road Bonnybridge, Falkirk, FK4 1BA
RegionScotland
Coordinates56.0096126Β°N, 3.8568131Β°W

Additional published register fields

Registered technologyBattery

πŸ“… Project Timeline

2017-03-10