Lancing College Campus is a 1 MW solar farm project in South East. The applicant or operator on record is Lancing College. The application has been withdrawn or the scheme abandoned. The determining authority is Adur, reference SDNP/18/05306/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJan 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2019-03-11.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.000 MW
Registered Capacity

πŸ“‹ Project Overview

Lancing College Campus is a 1 MW solar farm project in South East. The applicant or operator on record is Lancing College. The application has been withdrawn or the scheme abandoned. The determining authority is Adur, reference SDNP/18/05306/FUL.

Site Schematic

SUBSTATION ? ha Β· 1 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperLancing College
Owner / operatorLancing College
LocationCollege Drive, Lancing, West Sussex, Hampshire, BN15 0RW
RegionSouth East
Coordinates50.8455272Β°N, 0.3050896Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround

πŸ“… Project Timeline

2019-01-22