Lammas Leisure Centre, Lammas Road, Nottinghamshire, NG17 2AD
Lammas Leisure Centre, Lammas Road - Solar Panels is a 0.19 MW solar farm project in East Midlands. The applicant or operator on record is Ashfield District Council. Planning permission has been granted as of January 2025 and it is awaiting construction. The determining authorityβ¦
Consented / Approved
Project stageConsented
PlanningDec 2024 (completed)
ConsentedJan 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-05-12.
Registered planning capacity; not measured generation.
Lammas Leisure Centre, Lammas Road - Solar Panels is a 0.19 MW solar farm project in East Midlands. The applicant or operator on record is Ashfield District Council. Planning permission has been granted as of January 2025 and it is awaiting construction. The determining authority is Ashfield, reference X/2024/0051.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.190 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Ashfield District Council
Owner / operator
Ashfield District Council
Year consented
2025
Location
Lammas Leisure Centre, Lammas Road, Nottinghamshire, NG17 2AD