π Project Overview
Lakeside EfW Colnbrook (Replacement) is a 40 MW bioenergy / waste project in South East. The applicant or operator on record is Grundon Waste Management. The application has been withdrawn or the scheme abandoned. The determining authority is Slough, reference P/17826/000.
π§ Technical Specifications
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Grundon Waste Management |
| Owner / operator | Grundon Waste Management |
| Location | Land West Of The Iver Sou, Old Slade Lane, Sludge Dewatering Centre, Iver, Buckinghamshire, Berkshire, SL0 9DX |
| Region | South East |
| Coordinates | 51.4920696Β°N, 0.5121605Β°W |
Additional published register fields
| Registered technology | EfW Incineration |
|---|