Knowsley AD Facility is a 3 MW bioenergy / waste project in North West. The applicant or operator on record is Biogen (formerly Tamar Energy). The application has been withdrawn or the scheme abandoned. The determining authority is Knowsley, reference 14/00657/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningOct 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJul 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2018-03-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

3.000 MW
Registered Capacity

πŸ“‹ Project Overview

Knowsley AD Facility is a 3 MW bioenergy / waste project in North West. The applicant or operator on record is Biogen (formerly Tamar Energy). The application has been withdrawn or the scheme abandoned. The determining authority is Knowsley, reference 14/00657/FUL.

πŸ”§ Technical Specifications

Capacity (MW)3.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBiogen (formerly Tamar Energy)
Owner / operatorBiogen (formerly Tamar Energy)
Year consented2015
LocationLand off North Perimeter Road, Knowsley Industrial Park, Knowsley, Merseyside
RegionNorth West
Coordinates53.4920495Β°N, 2.855203Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2014-10-01
2015-07-15