Knowledge Dock, University Way, Beckton, Victoria Dock, London, E16 2RD
Knowledge Dock, University Way - Solar Panel is a 0.15 MW solar farm project in London. The applicant or operator on record is University of East London. Planning permission has been granted as of September 2023 and it is awaiting construction. The determining authority is Newhamβ¦
Consented / Approved
Project stageConsented
PlanningJul 2023 (completed)
ConsentedSep 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-09-21.
Registered planning capacity; not measured generation.
Knowledge Dock, University Way - Solar Panel is a 0.15 MW solar farm project in London. The applicant or operator on record is University of East London. Planning permission has been granted as of September 2023 and it is awaiting construction. The determining authority is Newham, reference 23/01611/PREPV.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.150 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
University of East London
Owner / operator
University of East London
Year consented
2023
Location