Knorr Bremse Rail Systems Uk Ltd, Westinghouse Way, Bowerhill, Wiltshire, SN12 6TL
Knorr Bremse Rail Systems Uk, Westinghouse Way - Solar Panels is a 0.42 MW solar farm project in South West. The applicant or operator on record is Knorr-Bremse Rail Systems UK Limited. Planning permission has been granted as of June 2026 and it is awaiting construction. The deteβ¦
Consented / Approved
Project stageConsented
PlanningApr 2026 (completed)
ConsentedJun 2026 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2026-05-14.
Registered planning capacity; not measured generation.
Knorr Bremse Rail Systems Uk, Westinghouse Way - Solar Panels is a 0.42 MW solar farm project in South West. The applicant or operator on record is Knorr-Bremse Rail Systems UK Limited. Planning permission has been granted as of June 2026 and it is awaiting construction. The determining authority is Wiltshire, reference PL/2026/02481.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.420 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Knorr-Bremse Rail Systems UK Limited
Owner / operator
Knorr-Bremse Rail Systems UK Limited
Year consented
2026