KNOCKENDURRICK WIND FARM, IRELANDTON MOOR, TWYNHOLM, KIRKCUDBRIGHT, Dumfries and Galloway
Knockendurrick Wind Farm is a 14 MW onshore wind project in Scotland. The applicant or operator on record is Banks Renewables. The planning application was refused. The determining authority is Dumfries and Galloway, reference 13/P/2/0284.β¦
Refused
Project stageRefused
PlanningOct 2013 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2018-09-03.
Registered planning capacity; not measured generation.
Knockendurrick Wind Farm is a 14 MW onshore wind project in Scotland. The applicant or operator on record is Banks Renewables. The planning application was refused. The determining authority is Dumfries and Galloway, reference 13/P/2/0284.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
14.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Banks Renewables
Owner / operator
Banks Renewables
Location
KNOCKENDURRICK WIND FARM, IRELANDTON MOOR, TWYNHOLM, KIRKCUDBRIGHT, Dumfries and Galloway