πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Kiveton Recycling Centre

The Old Kiveton Quarry, Dog Kennel Hill, Kiveton, Park Station, South Yorkshire, S26 6NG

Kiveton Recycling Centre is a 2.5 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Kiveton Heat and Power. The application has been withdrawn or the scheme abandoned. The determining authority is Rotherham, reference RB2008/1653.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningFeb 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedFeb 2010 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2016-03-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.500 MW
Registered Capacity

πŸ“‹ Project Overview

Kiveton Recycling Centre is a 2.5 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Kiveton Heat and Power. The application has been withdrawn or the scheme abandoned. The determining authority is Rotherham, reference RB2008/1653.

πŸ”§ Technical Specifications

Capacity (MW)2.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperKiveton Heat and Power
Owner / operatorKiveton Heat and Power
Year consented2010
LocationThe Old Kiveton Quarry, Dog Kennel Hill, Kiveton, Park Station, South Yorkshire, S26 6NG
RegionYorkshire and Humber
Coordinates53.3383051Β°N, 1.2413631Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2009-02-10
2010-02-03