Hollywood Bowl Woodside Leisure Park North Orbital Road, Hertfordshire, WD25 7JZ
Kingsway North Orbital Road - Solar Array is a 0.18 MW solar farm project in Eastern. The applicant or operator on record is Hollywood Bowl Group. Planning permission has been granted as of March 2022 and it is awaiting construction. The determining authority is Watford, referencβ¦
Consented / Approved
Project stageConsented
PlanningJan 2022 (completed)
ConsentedMar 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-02-09.
Registered planning capacity; not measured generation.
Kingsway North Orbital Road - Solar Array is a 0.18 MW solar farm project in Eastern. The applicant or operator on record is Hollywood Bowl Group. Planning permission has been granted as of March 2022 and it is awaiting construction. The determining authority is Watford, reference 22/00106/JJPD.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.180 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Hollywood Bowl Group
Owner / operator
Hollywood Bowl Group
Year consented
2022
Location
Hollywood Bowl Woodside Leisure Park North Orbital Road, Hertfordshire, WD25 7JZ