πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Kingston Solar farm

Kingston Solar Farm Leake Road Gotham, Nottinghamshire, NG11 0LF

Kingston Solar farm is a 49.9 MW solar farm project in East Midlands. The applicant or operator on record is Renewable Energy System Limited. The planning application was refused. The determining authority is Rushcliffe, reference 22/00319/FUL.…

Refused
Project stageRefused
  1. PlanningFeb 2022 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2022-03-07.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.900 MW
Registered Capacity

πŸ“‹ Project Overview

Kingston Solar farm is a 49.9 MW solar farm project in East Midlands. The applicant or operator on record is Renewable Energy System Limited. The planning application was refused. The determining authority is Rushcliffe, reference 22/00319/FUL.

Site Schematic

SUBSTATION ? ha Β· 49.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)49.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRenewable Energy System Limited
Owner / operatorRenewable Energy System Limited
LocationKingston Solar Farm Leake Road Gotham, Nottinghamshire, NG11 0LF
RegionEast Midlands
Coordinates52.8602253Β°N, 1.2183406Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)806500

πŸ“… Project Timeline

2022-02-18