πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Kingsnorth Industrial Estate

Kingsnorth Industrial Estate, Kingsnorth Works, Hoo, St Werbrugh, Rochester, Kent

Kingsnorth Industrial Estate is a 1.8 MW bioenergy / waste project in South East. The applicant or operator on record is AMP Holdings pic. The application has been withdrawn or the scheme abandoned. The determining authority is Medway, reference MC/15/4424.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningDec 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedApr 2016 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2017-12-19.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.800 MW
Registered Capacity

πŸ“‹ Project Overview

Kingsnorth Industrial Estate is a 1.8 MW bioenergy / waste project in South East. The applicant or operator on record is AMP Holdings pic. The application has been withdrawn or the scheme abandoned. The determining authority is Medway, reference MC/15/4424.

πŸ”§ Technical Specifications

Capacity (MW)1.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAMP Holdings pic
Owner / operatorAMP Holdings pic
Year consented2016
LocationKingsnorth Industrial Estate, Kingsnorth Works, Hoo, St Werbrugh, Rochester, Kent
RegionSouth East
Coordinates51.4255059Β°N, 0.600182Β°E

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2015-12-18
2016-04-04