Kings Oak Primary School, Oak Road, Bedford, Bedfordshire, MK42 0HH
Kings Oak Primary School, Oak Road - Solar Array is a 0.22 MW solar farm project in Eastern. The applicant or operator on record is Bedford Borough Council. The application has been withdrawn or the scheme abandoned. The determining authority is Bedford, reference 24/00030/DC3.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJan 2024 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2024-05-13.
Registered planning capacity; not measured generation.
Kings Oak Primary School, Oak Road - Solar Array is a 0.22 MW solar farm project in Eastern. The applicant or operator on record is Bedford Borough Council. The application has been withdrawn or the scheme abandoned. The determining authority is Bedford, reference 24/00030/DC3.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.220 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Bedford Borough Council
Owner / operator
Bedford Borough Council
Location
Kings Oak Primary School, Oak Road, Bedford, Bedfordshire, MK42 0HH