Kings Dock Biomass is a 49.9 MW bioenergy / waste project in Wales. The applicant or operator on record is Dingle Holdings. The planning application was refused. The determining authority is Swansea, reference 2007/2684.…

Refused
Project stageRefused
  1. PlanningNov 2007 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2011-09-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.900 MW
Registered Capacity

πŸ“‹ Project Overview

Kings Dock Biomass is a 49.9 MW bioenergy / waste project in Wales. The applicant or operator on record is Dingle Holdings. The planning application was refused. The determining authority is Swansea, reference 2007/2684.

πŸ”§ Technical Specifications

Capacity (MW)49.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperDingle Holdings
Owner / operatorDingle Holdings
LocationKings Dock , Swansea, West Glamorgan, SA1 8QT
RegionWales
Coordinates51.6158348Β°N, 3.9093414Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2007-11-27