Killingholme Power Station, Chase Hill Road - Hydrogen Production Facility

Killingholme Power Station, Chase Hill Road, Killingholme, Immingham, Lincolnshire, DN40 3LU

Killingholme Power Station, Chase Hill Road - Hydrogen Production Facility is a 120 MW conventional hydro project in Yorkshire and Humber. The applicant or operator on record is Uniper UK Limited. The scheme is currently in the planning system, submitted October 2025. The determi…

In Planning
120 MW
Installed Capacity

πŸ“‹ Project Overview

Killingholme Power Station, Chase Hill Road - Hydrogen Production Facility is a 120 MW conventional hydro project in Yorkshire and Humber. The applicant or operator on record is Uniper UK Limited. The scheme is currently in the planning system, submitted October 2025. The determining authority is North Lincolnshire, reference PA/2025/1146.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 120 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)120 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperUniper UK Limited
Owner / operatorUniper UK Limited
LocationKillingholme Power Station, Chase Hill Road, Killingholme, Immingham, Lincolnshire, DN40 3LU
RegionYorkshire and Humber
Coordinates53.6540169Β°N, 0.2553322Β°W