Keypoint, Unit 1, Thornhill Road, South Marston, Swindon, Wiltshire, SN3 4RY
Keypoint, South Marston - Solar panels is a 1.09 MW solar farm project in South West. The applicant or operator on record is Logicor. Planning permission has been granted as of January 2024 and it is awaiting construction. The determining authority is Swindon, reference S/23/0893β¦
Consented / Approved
Project stageConsented
PlanningSep 2023 (completed)
ConsentedJan 2024 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-09-26.
Registered planning capacity; not measured generation.
Keypoint, South Marston - Solar panels is a 1.09 MW solar farm project in South West. The applicant or operator on record is Logicor. Planning permission has been granted as of January 2024 and it is awaiting construction. The determining authority is Swindon, reference S/23/0893.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.090 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Logicor
Owner / operator
Logicor
Year consented
2024
Location
Keypoint, Unit 1, Thornhill Road, South Marston, Swindon, Wiltshire, SN3 4RY