Kent Medway Adolescent Hospital - Ground Mounted Solar Panels is a 0.23 MW solar farm project in South East. The applicant or operator on record is Kent and Medway Adolescent Unit. The planning application was refused. The determining authority is Maidstone, reference 24/503785/Fβ¦
Refused
Project stageRefused
PlanningSep 2024 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2025-04-01.
Registered planning capacity; not measured generation.
Kent Medway Adolescent Hospital - Ground Mounted Solar Panels is a 0.23 MW solar farm project in South East. The applicant or operator on record is Kent and Medway Adolescent Unit. The planning application was refused. The determining authority is Maidstone, reference 24/503785/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.