Kent Medway Adolescent Hospital - Ground Mounted Solar Panels is a 0.23 MW solar farm project in South East. The applicant or operator on record is Kent and Medway Adolescent Unit. The planning application was refused. The determining authority is Maidstone, reference 24/503785/F…

Refused
Project stageRefused
  1. PlanningSep 2024 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2025-04-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.230 MW
Registered Capacity

πŸ“‹ Project Overview

Kent Medway Adolescent Hospital - Ground Mounted Solar Panels is a 0.23 MW solar farm project in South East. The applicant or operator on record is Kent and Medway Adolescent Unit. The planning application was refused. The determining authority is Maidstone, reference 24/503785/FULL.

Site Schematic

SUBSTATION ? ha Β· 0.23 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.230 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperKent and Medway Adolescent Unit
Owner / operatorKent and Medway Adolescent Unit
LocationWoodland House, Winthrop Hall, Cranbrook Road, Staplehurst, Tonbridge, Kent, TN12 0ER
RegionSouth East
Coordinates51.1482327Β°N, 0.5554631Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)4440