πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Kenninghall Renewable Energy Facility (Waste AD)

Garboldisham Road,, Norfolk, NR16 2DU

Kenninghall Renewable Energy Facility (Waste AD) is a 1.2 MW bioenergy / waste project in Eastern. The applicant or operator on record is Greenshoots Energy. The scheme is currently in the planning system, submitted December 2010. The determining authority is Breckland, reference…

Revised
Project stageSuperseded by a new application
  1. PlanningDec 2010 (completed)
  2. Superseded by a new application (project stopped here)
  3. ConsentedNov 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2012-08-15.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.200 MW
Registered Capacity

πŸ“‹ Project Overview

Kenninghall Renewable Energy Facility (Waste AD) is a 1.2 MW bioenergy / waste project in Eastern. The applicant or operator on record is Greenshoots Energy. The scheme is currently in the planning system, submitted December 2010. The determining authority is Breckland, reference 3PL/2010/1372/F.

πŸ”§ Technical Specifications

Capacity (MW)1.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreenshoots Energy
Owner / operatorGreenshoots Energy
Year consented2011
LocationGarboldisham Road,, Norfolk, NR16 2DU
RegionEastern
Coordinates52.4242524Β°N, 0.9785193Β°E

Additional published register fields

Registered technologyAnaerobic Digestion
Are they re-applying (New REPD Ref)279

πŸ“… Project Timeline

2010-12-30
2011-11-09