Kenninghall Renewable Energy Facility (AD) is a 1.2 MW bioenergy / waste project in Eastern. The applicant or operator on record is Greenshoots Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Breckland, reference 3PL/2012/0737/F.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJul 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2013-11-15.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.200 MW
Registered Capacity

πŸ“‹ Project Overview

Kenninghall Renewable Energy Facility (AD) is a 1.2 MW bioenergy / waste project in Eastern. The applicant or operator on record is Greenshoots Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Breckland, reference 3PL/2012/0737/F.

πŸ”§ Technical Specifications

Capacity (MW)1.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreenshoots Energy
Owner / operatorGreenshoots Energy
LocationGarboldisham Road,, Norfolk, NR16 2DU
RegionEastern
Coordinates52.4249526Β°N, 0.9864074Β°E

Additional published register fields

Registered technologyAnaerobic Digestion
Are they re-applying (Old REPD Ref) 274

πŸ“… Project Timeline

2012-07-05