Site at
Kempstone Hill
Stonehaven
AB39 3QB, Grampian
Kempstone Hill Wind Turbines is a 2.4 MW onshore wind project in Scotland. The applicant or operator on record is Kempstone Hill Wind Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Aberdeenshire, reference APP/2012/2595.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningAug 2012 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2013-04-08.
Registered planning capacity; not measured generation.
Kempstone Hill Wind Turbines is a 2.4 MW onshore wind project in Scotland. The applicant or operator on record is Kempstone Hill Wind Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Aberdeenshire, reference APP/2012/2595.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
2.400 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Kempstone Hill Wind Energy
Owner / operator
Kempstone Hill Wind Energy
Location
Site at
Kempstone Hill
Stonehaven
AB39 3QB, Grampian