πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Kempston Swimming Pool, Hillgrounds Road - Solar PV Panels

Kempston Swimming Pool 288 Hillgrounds Road Kempston, Bedfordshire, MK42 8SZ

Kempston Swimming Pool, Hillgrounds Road - Solar PV Panels is a 0.18 MW solar farm project in Eastern. The applicant or operator on record is Bedford Borough Council. The planning application was refused. The determining authority is Bedford, reference 24/02159/SPNJ.…

Refused
Project stageRefused
  1. PlanningNov 2024 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2025-01-14.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.180 MW
Registered Capacity

πŸ“‹ Project Overview

Kempston Swimming Pool, Hillgrounds Road - Solar PV Panels is a 0.18 MW solar farm project in Eastern. The applicant or operator on record is Bedford Borough Council. The planning application was refused. The determining authority is Bedford, reference 24/02159/SPNJ.

Site Schematic

SUBSTATION ? ha Β· 0.18 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.180 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBedford Borough Council
Owner / operatorBedford Borough Council
LocationKempston Swimming Pool 288 Hillgrounds Road Kempston, Bedfordshire, MK42 8SZ
RegionEastern
Coordinates52.1261142Β°N, 0.4884334Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2024-11-11