πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Onshore Wind

Jordanston Wind Farm

Land at Jordanston south of Fishguard Dyfed, Dyfed

Jordanston Wind Farm is a 9.8 MW onshore wind project in Wales. The applicant or operator on record is RWE npower. The planning application was refused. The determining authority is Pembrokeshire, reference 97/520.…

Refused
Project stageRefused
  1. PlanningSep 1997 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2001-07-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

9.800 MW
Registered Capacity

πŸ“‹ Project Overview

Jordanston Wind Farm is a 9.8 MW onshore wind project in Wales. The applicant or operator on record is RWE npower. The planning application was refused. The determining authority is Pembrokeshire, reference 97/520.

Site Schematic

WALES Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)9.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRWE npower
Owner / operatorRWE npower
LocationLand at Jordanston south of Fishguard Dyfed, Dyfed
RegionWales
Coordinates51.9547984Β°N, 5.024081Β°W

Additional published register fields

Registered technologyWind Onshore

πŸ“… Project Timeline

1997-09-30