Units 22, 23, 25, 26, 27, 30, 32, 33, 37 Jessops Riverside 800 Brightside Lane, South Yorkshire, S9 2RX
Jessops Riverside, Brightside Lane - Solar Panels is a 0.39 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Ecovision. Planning permission has been granted as of March 2024 and it is awaiting construction. The determining authority is Sheffieβ¦
Consented / Approved
Project stageConsented
PlanningFeb 2024 (completed)
ConsentedMar 2024 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2024-04-04.
Registered planning capacity; not measured generation.
Jessops Riverside, Brightside Lane - Solar Panels is a 0.39 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Ecovision. Planning permission has been granted as of March 2024 and it is awaiting construction. The determining authority is Sheffield, reference 24/00262/PVPN.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.390 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Ecovision
Owner / operator
Ecovision
Year consented
2024
Location
Units 22, 23, 25, 26, 27, 30, 32, 33, 37 Jessops Riverside 800 Brightside Lane, South Yorkshire, S9 2RX