Land 200M South E Of The Bothy, Jamesfield, Newburgh, Cupar, Fife, Perth and Kinross, KY14 6EW
Jamesfield Solar Farm is a 5 MW solar farm project in Scotland. The applicant or operator on record is Green Power Consultants. The planning permission has expired. The determining authority is Perth and Kinross, reference 15/00833/FLL.β¦
Expired
Project stageConsent lapsed
PlanningJun 2015 (completed)
ConsentedAug 2015 (completed)
Consent lapsed (project stopped here)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Expired.
Official register: July 2026
Recorded status: Planning Permission Expired. Source record updated 2018-09-27.
Registered planning capacity; not measured generation.
Jamesfield Solar Farm is a 5 MW solar farm project in Scotland. The applicant or operator on record is Green Power Consultants. The planning permission has expired. The determining authority is Perth and Kinross, reference 15/00833/FLL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Green Power Consultants
Owner / operator
Green Power Consultants
Year consented
2015
Location
Land 200M South E Of The Bothy, Jamesfield, Newburgh, Cupar, Fife, Perth and Kinross, KY14 6EW