Solar Farm

Jamesfield Solar Farm

Land 200M South E Of The Bothy, Jamesfield, Newburgh, Cupar, Fife, Perth and Kinross, KY14 6EW

Jamesfield Solar Farm is a 5 MW solar farm project in Scotland. The applicant or operator on record is Green Power Consultants. The planning permission has expired. The determining authority is Perth and Kinross, reference 15/00833/FLL.…

Expired
5 MW
Installed Capacity

πŸ“‹ Project Overview

Jamesfield Solar Farm is a 5 MW solar farm project in Scotland. The applicant or operator on record is Green Power Consultants. The planning permission has expired. The determining authority is Perth and Kinross, reference 15/00833/FLL.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreen Power Consultants
Owner / operatorGreen Power Consultants
Year consented2015
LocationLand 200M South E Of The Bothy, Jamesfield, Newburgh, Cupar, Fife, Perth and Kinross, KY14 6EW
RegionScotland
Coordinates56.3474399Β°N, 3.2952529Β°W

πŸ“… Project Timeline