James Cropper Effluent Plant, Burneside, Kendal, Cumbria, Cumbria, LA9 6PZ
James Cropper Effluent Plant is a 1 MW solar farm project in North West. The applicant or operator on record is Ellergreen Estate. The application has been withdrawn or the scheme abandoned. The determining authority is Westmorland and Furness, reference SL/2019/1027.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningDec 2019 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2020-06-30.
Registered planning capacity; not measured generation.
James Cropper Effluent Plant is a 1 MW solar farm project in North West. The applicant or operator on record is Ellergreen Estate. The application has been withdrawn or the scheme abandoned. The determining authority is Westmorland and Furness, reference SL/2019/1027.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Ellergreen Estate
Owner / operator
Ellergreen Estate
Location
James Cropper Effluent Plant, Burneside, Kendal, Cumbria, Cumbria, LA9 6PZ