James Cropper Effluent Plant is a 1 MW solar farm project in North West. The applicant or operator on record is Ellergreen Estate. The application has been withdrawn or the scheme abandoned. The determining authority is Westmorland and Furness, reference SL/2019/1027.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningDec 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2020-06-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.000 MW
Registered Capacity

πŸ“‹ Project Overview

James Cropper Effluent Plant is a 1 MW solar farm project in North West. The applicant or operator on record is Ellergreen Estate. The application has been withdrawn or the scheme abandoned. The determining authority is Westmorland and Furness, reference SL/2019/1027.

Site Schematic

SUBSTATION ? ha Β· 1 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEllergreen Estate
Owner / operatorEllergreen Estate
LocationJames Cropper Effluent Plant, Burneside, Kendal, Cumbria, Cumbria, LA9 6PZ
RegionNorth West
Coordinates54.3560531Β°N, 2.7615729Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)18400

πŸ“… Project Timeline