Solar Farm

Inwood Farm

Nether Stowey, Bridgwater, Somerset, Somerset

Inwood Farm is a 2 MW solar farm project in South West. The applicant or operator on record is ZW Nether Stowey Ltd. The planning application was refused. The determining authority is Somerset, reference 36/11/00005.…

Refused
Project stageRefused
  1. PlanningMar 2011 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2011-08-05.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity

πŸ“‹ Project Overview

Inwood Farm is a 2 MW solar farm project in South West. The applicant or operator on record is ZW Nether Stowey Ltd. The planning application was refused. The determining authority is Somerset, reference 36/11/00005.

Site Schematic

SUBSTATION ? ha Β· 2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperZW Nether Stowey Ltd
Owner / operatorZW Nether Stowey Ltd
LocationNether Stowey, Bridgwater, Somerset, Somerset
RegionSouth West
Coordinates51.1507595Β°N, 3.1476269Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)56600

πŸ“… Project Timeline

2011-03-31