Land At Valley Farm Ingst Hill Olveston Bristol South Gloucestershire, Avon, BS35 4AP
Ingst Hill Wind Farm/ M48 Wind Farm is a 5.2 MW onshore wind project in South West. The applicant or operator on record is REG Windpower. The application has been withdrawn or the scheme abandoned. The determining authority is South Gloucestershire, reference PT12/4071/F.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningDec 2012 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Withdrawn.
Official register: July 2026
Recorded status: Appeal Withdrawn. Source record updated 2015-10-29.
Registered planning capacity; not measured generation.
Ingst Hill Wind Farm/ M48 Wind Farm is a 5.2 MW onshore wind project in South West. The applicant or operator on record is REG Windpower. The application has been withdrawn or the scheme abandoned. The determining authority is South Gloucestershire, reference PT12/4071/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.200 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
REG Windpower
Owner / operator
REG Windpower
Location
Land At Valley Farm Ingst Hill Olveston Bristol South Gloucestershire, Avon, BS35 4AP