GSK Icon Harlow Third Avenue Harlow, Essex, CM19 5AW
Icon Harlow, Gsk Third Avenue - Solar Photovoltaic Panels is a 0.58 MW solar farm project in Eastern. The applicant or operator on record is FRELIF (Harlow). The planning application was refused. The determining authority is Harlow, reference HW/PASP/23/00302.β¦
Refused
Project stageRefused
PlanningJul 2023 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2023-09-20.
Registered planning capacity; not measured generation.
Icon Harlow, Gsk Third Avenue - Solar Photovoltaic Panels is a 0.58 MW solar farm project in Eastern. The applicant or operator on record is FRELIF (Harlow). The planning application was refused. The determining authority is Harlow, reference HW/PASP/23/00302.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.580 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
FRELIF (Harlow)
Owner / operator
FRELIF (Harlow)
Location
GSK Icon Harlow Third Avenue Harlow, Essex, CM19 5AW