Solar Farm

Icon Harlow, Gsk Third Avenue - Solar Photovoltaic Panels

GSK Icon Harlow Third Avenue Harlow, Essex, CM19 5AW

Icon Harlow, Gsk Third Avenue - Solar Photovoltaic Panels is a 0.58 MW solar farm project in Eastern. The applicant or operator on record is FRELIF (Harlow). The planning application was refused. The determining authority is Harlow, reference HW/PASP/23/00302.…

Refused
Project stageRefused
  1. PlanningJul 2023 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2023-09-20.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.580 MW
Registered Capacity

πŸ“‹ Project Overview

Icon Harlow, Gsk Third Avenue - Solar Photovoltaic Panels is a 0.58 MW solar farm project in Eastern. The applicant or operator on record is FRELIF (Harlow). The planning application was refused. The determining authority is Harlow, reference HW/PASP/23/00302.

Site Schematic

SUBSTATION ? ha Β· 0.58 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.580 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFRELIF (Harlow)
Owner / operatorFRELIF (Harlow)
LocationGSK Icon Harlow Third Avenue Harlow, Essex, CM19 5AW
RegionEastern
Coordinates51.7618608Β°N, 0.0712877Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2023-07-21