π Project Overview
Hurlingpot Farm is a 5.3 MW solar farm project in South West. The applicant or operator on record is AEE Renewables. The planning application was refused. The determining authority is Somerset, reference 2012/1562.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 5.300 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | AEE Renewables |
| Owner / operator | AEE Renewables |
| Location | Doulting, Somerset, BA4 4PT |
| Region | South West |
| Coordinates | 51.1905017Β°N, 2.5159643Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Ground |
| Solar Site Area (sqm) | 139000 |