Hurlingpot Farm

Doulting, Somerset, BA4 4PT

Hurlingpot Farm is a 5.3 MW solar farm project in South West. The applicant or operator on record is AEE Renewables. The planning application was refused. The determining authority is Somerset, reference 2012/1562.…

Refused
Project stageRefused
  1. PlanningAug 2012 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2014-01-20.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.300 MW
Registered Capacity

πŸ“‹ Project Overview

Hurlingpot Farm is a 5.3 MW solar farm project in South West. The applicant or operator on record is AEE Renewables. The planning application was refused. The determining authority is Somerset, reference 2012/1562.

Site Schematic

SUBSTATION ? ha Β· 5.3 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAEE Renewables
Owner / operatorAEE Renewables
LocationDoulting, Somerset, BA4 4PT
RegionSouth West
Coordinates51.1905017Β°N, 2.5159643Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)139000

πŸ“… Project Timeline

2012-08-13