March Landfill site on Hundred Road, Cambridgeshire, Cambridgeshire
Hundred Road Wind Turbines is a 6 MW onshore wind project in Eastern. The applicant or operator on record is FCC Environment. The application has been withdrawn or the scheme abandoned. The determining authority is Peterborough, reference F/YR11/0444/F.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJun 2011 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Withdrawn.
Official register: July 2026
Recorded status: Appeal Withdrawn. Source record updated 2015-09-02.
Registered planning capacity; not measured generation.
Hundred Road Wind Turbines is a 6 MW onshore wind project in Eastern. The applicant or operator on record is FCC Environment. The application has been withdrawn or the scheme abandoned. The determining authority is Peterborough, reference F/YR11/0444/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
6.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
FCC Environment
Owner / operator
FCC Environment
Location
March Landfill site on Hundred Road, Cambridgeshire, Cambridgeshire