πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Humberfield Landfill Scheme

Humberfield Farm , Ferriby High Road, Hessle ,, Humberside

Humberfield Landfill Scheme is a 2.3 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Winerton Power Ltd / FCC Environment. The application has been withdrawn or the scheme abandoned. The determining authority is East Riding of Yorkshir…

Withdrawn
Project stageWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2014-12-03.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.300 MW
Registered Capacity

πŸ“‹ Project Overview

Humberfield Landfill Scheme is a 2.3 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Winerton Power Ltd / FCC Environment. The application has been withdrawn or the scheme abandoned. The determining authority is East Riding of Yorkshire, reference 326-10172.

πŸ”§ Technical Specifications

Capacity (MW)2.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWinerton Power Ltd / FCC Environment
Owner / operatorWinerton Power Ltd / FCC Environment
LocationHumberfield Farm , Ferriby High Road, Hessle ,, Humberside
RegionYorkshire and Humber
Coordinates53.7233378Β°N, 0.4707813Β°W

Additional published register fields

Registered technologyLandfill Gas