Solar Farm

Horsham Road

Land adjacent to the A24 bypass, to the south west of Beare Green, Mole Valle, Surrey, Surrey

Horsham Road is a 5 MW solar farm project in South East. The applicant or operator on record is TGC Renewables. The planning application was refused. The determining authority is Mole Valley, reference MO/2014/1092.…

Refused
Project stageRefused
  1. PlanningJul 2014 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2015-08-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Horsham Road is a 5 MW solar farm project in South East. The applicant or operator on record is TGC Renewables. The planning application was refused. The determining authority is Mole Valley, reference MO/2014/1092.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperTGC Renewables
Owner / operatorTGC Renewables
LocationLand adjacent to the A24 bypass, to the south west of Beare Green, Mole Valle, Surrey, Surrey
RegionSouth East
Coordinates51.1698338Β°N, 0.3231527Β°W

Additional published register fields

Registered technologySolar Photovoltaics

πŸ“… Project Timeline

2014-07-16