Battery Storage

Hopsrig Wind Farm

west of the B709, approximately 7.5 km north-west of Langholm and 15 km north-east of Lockerbie, Dumfries and Galloway, DG13

Hopsrig Wind Farm is a 14.1 MW battery storage project in Scotland. The applicant or operator on record is Muirhall Energy Limited. The scheme is currently in the planning system, submitted October 2020. The determining authority is Scottish Government (S36), reference ECU0000216…

In Planning
Project stageIn planning
  1. PlanningOct 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2022-04-26.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

14.100 MW
Power Capacity

πŸ“‹ Project Overview

Hopsrig Wind Farm is a 14.1 MW battery storage project in Scotland. The applicant or operator on record is Muirhall Energy Limited. The scheme is currently in the planning system, submitted October 2020. The determining authority is Scottish Government (S36), reference ECU00002160.

Site Schematic

GRID CONNECTION TRANSFORMER 33 kV DC BUSBAR 1234567891011121314151617181920 ? Γ— Battery Units

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)14.100 MW
Battery chemistryCo-located with RE

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMuirhall Energy Limited
Owner / operatorMuirhall Energy Limited
Locationwest of the B709, approximately 7.5 km north-west of Langholm and 15 km north-east of Lockerbie, Dumfries and Galloway, DG13
RegionScotland
Coordinates55.1858474Β°N, 3.1268694Β°W

Additional published register fields

Registered technologyBattery
Storage Co-location REPD Ref ID11065

πŸ“… Project Timeline

2020-10-23