Home Farm, Worset Lane, Elwick, Hartlepool, Cleveland, TS27 3BL
Home Farm is a 13 MW solar farm project in North East. The applicant or operator on record is European Energy Photovoltaics. The application has been withdrawn or the scheme abandoned. The determining authority is Hartlepool, reference H/2014/0513.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningOct 2014 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedMar 2016 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2020-01-15.
Registered planning capacity; not measured generation.
Home Farm is a 13 MW solar farm project in North East. The applicant or operator on record is European Energy Photovoltaics. The application has been withdrawn or the scheme abandoned. The determining authority is Hartlepool, reference H/2014/0513.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
13.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
European Energy Photovoltaics
Owner / operator
European Energy Photovoltaics
Year consented
2016