Land at Holm and Hollymill, King Edward, Banff, Grampian, AB45 3PB
Holm and Hollymill Wind Turbines is a 4.6 MW onshore wind project in Scotland. The applicant or operator on record is Good Energy Generation. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2012/0151.β¦
Refused
Project stageRefused
PlanningJan 2012 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2014-03-03.
Registered planning capacity; not measured generation.
Holm and Hollymill Wind Turbines is a 4.6 MW onshore wind project in Scotland. The applicant or operator on record is Good Energy Generation. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2012/0151.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
4.600 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Good Energy Generation
Owner / operator
Good Energy Generation
Location
Land at Holm and Hollymill, King Edward, Banff, Grampian, AB45 3PB