π Project Overview
Hollywood Bowl, Aintree Oval - Solar Photovoltaics Panels is a 0.3 MW solar farm project in North East. The applicant or operator on record is Hollywood Bowl Group (Head Office). Planning permission has been granted as of December 2024 and it is awaiting construction. The determining authority is Middlesbrough, reference 24/0489/PNO.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Hollywood Bowl Group (Head Office) |
| Owner / operator | Hollywood Bowl Group (Head Office) |
| Year consented | 2024 |
| Location | Hollywood Bowl, Aintree Oval, Stockton on Tees, Cleveland, TS17 7BU |
| Region | North East |
| Coordinates | 54.5601759Β°N, 1.2738243Β°W |