Hogshaw Road, Granborough - Battery Energy Storage System is a 99 MW battery storage project in South East. The applicant or operator on record is Root Power (South) Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Buckinghamshire,…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningDec 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2025-04-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

99.000 MW
Power Capacity

πŸ“‹ Project Overview

Hogshaw Road, Granborough - Battery Energy Storage System is a 99 MW battery storage project in South East. The applicant or operator on record is Root Power (South) Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Buckinghamshire, reference 24/03262/APP.

Site Schematic

GRID CONNECTION TRANSFORMER 33 kV DC BUSBAR 1234567891011121314151617181920 ? Γ— Battery Units

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)99.000 MW
Battery chemistryStand-alone Storage

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRoot Power (South) Limited
Owner / operatorRoot Power (South) Limited
LocationSouth Of Hogshaw Road Granborough, Buckinghamshire, MK18 3DA
RegionSouth East
Coordinates51.9192824Β°N, 0.8875716Β°W

Additional published register fields

Registered technologyBattery

πŸ“… Project Timeline

2024-12-17