Solar Farm

HM Erlestoke Solar Array

H M Prison Erlestoke, Wiltshire, SN10 5TU

HM Erlestoke Solar Array is a 0.21 MW solar farm project in South West. The applicant or operator on record is Ministry of Justice. The scheme is currently in the planning system, submitted December 2020. The determining authority is Wiltshire, reference 20/11600/FUL.…

In Planning
Project stageIn planning
  1. PlanningDec 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2021-01-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.210 MW
Registered Capacity

πŸ“‹ Project Overview

HM Erlestoke Solar Array is a 0.21 MW solar farm project in South West. The applicant or operator on record is Ministry of Justice. The scheme is currently in the planning system, submitted December 2020. The determining authority is Wiltshire, reference 20/11600/FUL.

Site Schematic

SUBSTATION ? ha Β· 0.21 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.210 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMinistry of Justice
Owner / operatorMinistry of Justice
LocationH M Prison Erlestoke, Wiltshire, SN10 5TU
RegionSouth West
Coordinates51.2846619Β°N, 2.0441566Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)5300

πŸ“… Project Timeline

2020-12-24