Farmland to the East of Crynant and Seven Sisters adjoining forestry at Hirfynydd, West Glamorgan
Hirfynydd is a 18 MW onshore wind project in Wales. The applicant or operator on record is Wind Ventures (Acciona Energy). The planning application was refused. The determining authority is Neath Port Talbot, reference P2008/0024.β¦
Refused
Project stageRefused
PlanningJan 2008 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2015-10-05.
Registered planning capacity; not measured generation.
Hirfynydd is a 18 MW onshore wind project in Wales. The applicant or operator on record is Wind Ventures (Acciona Energy). The planning application was refused. The determining authority is Neath Port Talbot, reference P2008/0024.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
18.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Wind Ventures (Acciona Energy)
Owner / operator
Wind Ventures (Acciona Energy)
Location
Farmland to the East of Crynant and Seven Sisters adjoining forestry at Hirfynydd, West Glamorgan