Hirddywell Windfarm is a 14.8 MW onshore wind project in Wales. The applicant or operator on record is CELTPOWER LTD. The application has been withdrawn or the scheme abandoned. The determining authority is Powys, reference M/2000/0705.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningAug 2000 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2011-06-29.
Registered planning capacity; not measured generation.
Hirddywell Windfarm is a 14.8 MW onshore wind project in Wales. The applicant or operator on record is CELTPOWER LTD. The application has been withdrawn or the scheme abandoned. The determining authority is Powys, reference M/2000/0705.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.