Solar Farm

Hillingdon Sports & Leisure Centre - Solar Panels

Hillingdon Sports And Leisure Centre, Gatting Way, Uxbridge, London, UB8 1ES

Hillingdon Sports & Leisure Centre - Solar Panels is a 0.22 MW solar farm project in London. The applicant or operator on record is Ameresco Limited. Planning permission has been granted as of January 2024 and it is awaiting construction. The determining authority is Hillingdon,…

Consented / Approved
Project stageConsented
  1. PlanningOct 2023 (completed)
  2. ConsentedJan 2024 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2024-01-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.220 MW
Registered Capacity

πŸ“‹ Project Overview

Hillingdon Sports & Leisure Centre - Solar Panels is a 0.22 MW solar farm project in London. The applicant or operator on record is Ameresco Limited. Planning permission has been granted as of January 2024 and it is awaiting construction. The determining authority is Hillingdon, reference 2543/APP/2023/2972.

Site Schematic

SUBSTATION ? ha Β· 0.22 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.220 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAmeresco Limited
Owner / operatorAmeresco Limited
Year consented2024
LocationHillingdon Sports And Leisure Centre, Gatting Way, Uxbridge, London, UB8 1ES
RegionLondon
Coordinates51.5509925Β°N, 0.4672574Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Solar Site Area (sqm)7600

πŸ“… Project Timeline

2023-10-12
2024-01-19