Between Pumping Staton And Kempston Swimming Pool 288 Hillgrounds Road Kempston, Bedfordshire, MK42 8SZ
Hillgrounds Road, Kempston - Energy Storage Facility is a 0.2 MW battery storage project in Eastern. The applicant or operator on record is AMP Clean Energy. The planning application was refused. The determining authority is Bedford, reference 25/00381/FUL.β¦
Refused
Project stageRefused
PlanningFeb 2025 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2025-05-06.
Registered planning capacity; not measured generation.
Hillgrounds Road, Kempston - Energy Storage Facility is a 0.2 MW battery storage project in Eastern. The applicant or operator on record is AMP Clean Energy. The planning application was refused. The determining authority is Bedford, reference 25/00381/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.200 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
AMP Clean Energy
Owner / operator
AMP Clean Energy
Location
Between Pumping Staton And Kempston Swimming Pool 288 Hillgrounds Road Kempston, Bedfordshire, MK42 8SZ