π Project Overview
Hillgrounds Road, Kempston - Energy Storage Facility is a 0.2 MW battery storage project in Eastern. The applicant or operator on record is AMP Clean Energy. The scheme is currently in the planning system, submitted July 2024. The determining authority is Bedford, reference 24/01478/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
| Battery chemistry | Stand-alone Storage |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | AMP Clean Energy |
| Owner / operator | AMP Clean Energy |
| Location | Between Pumping Staton And Kempston Swimming Pool 288 Hillgrounds Road Kempston, Bedfordshire, MK42 8SZ |
| Region | Eastern |
| Coordinates | 52.1269872Β°N, 0.4899085Β°W |