Rear of Hillcrest, Church Road, Sundon, Bedfordshire, LU3 3PB
Hillcrest, Church Road - Battery Energy Storage is a 50 MW battery storage project in Eastern. The applicant or operator on record is Root Power South Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Central Bedfordshire, referenceβ¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningNov 2024 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2025-01-27.
Registered planning capacity; not measured generation.
Hillcrest, Church Road - Battery Energy Storage is a 50 MW battery storage project in Eastern. The applicant or operator on record is Root Power South Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Central Bedfordshire, reference CB/24/02977/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
50.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Root Power South Limited
Owner / operator
Root Power South Limited
Location
Rear of Hillcrest, Church Road, Sundon, Bedfordshire, LU3 3PB