The E/O Chapelton Farm, Drumblade, Huntly, Aberdeenshire, AB54 6AS
Hill of Stoneyfield - Wind Turbines is a 14.4 MW onshore wind project in Scotland. The applicant or operator on record is Wind 2 Limited. The scheme is currently in the planning system, submitted May 2025. The determining authority is Aberdeenshire, reference APP/2025/0514.β¦
In Planning
Project stageIn planning
PlanningMay 2025 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2025-06-23.
Registered planning capacity; not measured generation.
Hill of Stoneyfield - Wind Turbines is a 14.4 MW onshore wind project in Scotland. The applicant or operator on record is Wind 2 Limited. The scheme is currently in the planning system, submitted May 2025. The determining authority is Aberdeenshire, reference APP/2025/0514.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
14.400 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Wind 2 Limited
Owner / operator
Wind 2 Limited
Location
The E/O Chapelton Farm, Drumblade, Huntly, Aberdeenshire, AB54 6AS