Land at Hill of Carlincraig Land to the South-East of Newton of Fortrie Farm Turriff AB53 4HL, Grampian, AB53 4HL
Hill of Carlincraig wind turbines is a 4.6 MW onshore wind project in Scotland. The applicant or operator on record is Newton Of Fortrie LLP/Muirden Energy. The planning permission has expired. The determining authority is Aberdeenshire, reference APP/2013/0987.β¦
Expired
Project stageConsent lapsed
PlanningApr 2013 (completed)
ConsentedJul 2015 (completed)
Consent lapsed (project stopped here)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Expired.
Official register: July 2026
Recorded status: Planning Permission Expired. Source record updated 2020-09-23.
Registered planning capacity; not measured generation.
Hill of Carlincraig wind turbines is a 4.6 MW onshore wind project in Scotland. The applicant or operator on record is Newton Of Fortrie LLP/Muirden Energy. The planning permission has expired. The determining authority is Aberdeenshire, reference APP/2013/0987.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
4.600 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Newton Of Fortrie LLP/Muirden Energy
Owner / operator
Newton Of Fortrie LLP/Muirden Energy
Year consented
2015
Location
Land at Hill of Carlincraig Land to the South-East of Newton of Fortrie Farm Turriff AB53 4HL, Grampian, AB53 4HL