Land To The North Of St Johns, Fyvie, Turriff, Grampian, Aberdeenshire, AB53 8PX
Hill of Blairfowl Solar Farm is a 1.5 MW solar farm project in Scotland. The applicant or operator on record is Green Cat Renewables. The planning permission has expired. The determining authority is Aberdeenshire, reference APP/2015/1819.β¦
Expired
Project stageConsent lapsed
PlanningJun 2015 (completed)
ConsentedAug 2015 (completed)
Consent lapsed (project stopped here)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Expired.
Official register: July 2026
Recorded status: Planning Permission Expired. Source record updated 2018-10-25.
Registered planning capacity; not measured generation.
Hill of Blairfowl Solar Farm is a 1.5 MW solar farm project in Scotland. The applicant or operator on record is Green Cat Renewables. The planning permission has expired. The determining authority is Aberdeenshire, reference APP/2015/1819.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.500 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Green Cat Renewables
Owner / operator
Green Cat Renewables
Year consented
2015
Location
Land To The North Of St Johns, Fyvie, Turriff, Grampian, Aberdeenshire, AB53 8PX